assessor:cost_land_report

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revisionBoth sides next revision
assessor:cost_land_report [2023/01/12 21:23 UTC] samuelassessor:cost_land_report [2023/01/12 21:37 UTC] – [How to Use] samuel
Line 1: Line 1:
 ====== Cost/Land Report ====== ====== Cost/Land Report ======
-As of Version 22.12.30 of //Assessor2k//, the Cost/Land Report was added to the "Summary" tab from the Master Menu.+The Cost/Land Report was added in Version 22.12.30 of //Assessor2k//
 +===== How to Use ===== 
 +{{:assessor:thumbnail_image001.png?nolink&600|}}\\ \\  
 +Click [Cost/Land Reportto open the blue box. You have the flexibility to generate:\\  
 +  * Improvement-only value breakdown report 
 +  * Land-only value breakdown report 
 +  * Both Improvement and Land value breakdowns 
 + 
 +<WRAP left round tip 50%> 
 +"Both" is the default "assessment" selection. 
 +</WRAP>\\ \\ \\ \\  
 + 
 + 
 +In the spirit of the "Land" tab's Acreage breakdown, you can select either the "Acreage" or "Sq Ft" calculationYour choice of measurement will display on "Land" or "Both" assessment reports where applicable. //Note: these options are disabled if you've selected the "Improvement" assessment.//
  • assessor/cost_land_report.txt
  • Last modified: 2023/01/13 21:14 UTC
  • by samuel